2012, ഓഗസ്റ്റ് 8, ബുധനാഴ്‌ച


 Lapse in maintenance work on Pazhassi dam, assistant engineer suspended.
KANNUR: The water level in the Pazhassi dam which overflowed after the landslide has lowered.

Minister for Irrigation P J Joseph, who visited the site yesterday, had directed to take disciplinary action against all officers who had been responsible for the lapse.

On a report by irrigation chief engineer Lathika, Gopalan, assistant engineer, has been suspended on charge of lapse in maintenance work.

A 70-member National Disaster Response Force has come to the site and a naval team is also camping in Thalassery.

അഭിപ്രായങ്ങളൊന്നുമില്ല:

ആബുലൻസ മറിഞ്ഞ് രോഗി തീ പിടിച്ചു മരിച്ചു.

[ The ambulance overturned and caught fire and the patient was burnt Pay caculans fell into the Kalad hospital and caught fire. Nadapur...